Cart

{{ successMessage }}
{{item.orderingCode}}
Qty: {{ item.quantity }}
{{currencySymbol}}{{item.pricing.totalPrice | intlNumber('en-TT','USD')}}
Subtotal ({{totalQty}} {{totalQty === 1 ? "item" : "items"}}):
{{currencySymbol}}{{cartSummary.total | intlNumber('en-TT','USD')}}
TEST SITE
You will not be charged yet.

Case Study: Determining Total Volume of Sludge in Wastewater Ponding Lagoons

Kalgoorlie-Boulder Wastewater Treatment Plant (WWTP)

Surveys were performed of three Wastewater Ponding Lagoons and a TWM storage lagoon at Kalgoorlie-Boulder Wastewater Treatment Plant (WWTP) to determine the total volume of sludge. The volume of sludge at each lagoon was calculated based on surface elevation model developed from land survey and as-build drawing. The equipment chosen for the surveys consisted of two Global Navigation Satellite System (GNSS) receivers, CEE HydroSystems CEESCOPE with dual frequency echo sounder and rQPOD with autonomous navigation. The survey software utilized during the surveys consisted of HYPACK® Hydrographic Survey and Carlson SurvCE software.

Download Case study