-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Vortisand® Systems Reduce Medical Center's Cooling Tower Costs
The $500 million 434,000 square-foot, 6-story hospital building houses 262 beds and the adjacent medical office building is housed in a 172,000 square-foot, 6-story structure. In order to provide cooling and energy services to the campus, a 3-story, 31,800 square-foot central utility plant was included in the design. -
Award-Winning Wastewater Treatment Project Completed at Recycle Paper Mill
Shanghai Xinlun Paper was upgrading its pulping and paper-making process. As this was taking place, new regulations came into effect that required the mill to invest in secondary wastewater treatment so it could meet stringent effluent limits of 100 mg/l chemical oxygen demand (COD), 30 mg/l biochemical oxygen demand (BOD), and 200 mg/l total suspended solids (TSS). -
-
-
-
-
-
-